During this 12-month project, IRI crew:
- Manufactured, assembled and installed a 42 x 10 stainless steel mezzanine for a new process line.
- Installed over 200 feet of stainless steel piping for hydraulic and hot oil lines.
- Relocated microwave ovens nearly 3,000 cubic feet in size.
- Removed 200 linear feet of deteriorating glycol lines and replaced with new HDPE glycol heating lines in floor.